top of page

AREA FALCK REDEVELOPMENT

Ex Industrial site redevelopment

In collaboration with the Kenzo Tange Associates architecture firm, the study of development.

The area of ​​the Falck steelworks extends over 130 hectares and is well served by rail, underground and motorway.

networks.

The integrated development hypothesis envisaged in the project guide includes:

Thematic Park of Multimedia Communication for 3 million visitors / year
Production and Research Area for technologies related to the theme of the Park
Craft and small industry area • Hotels • 2 office areas in the points best served by public transport
residential areas;
6 Green parks aimed at public enjoyment, each characterized by a different function: Culture (museum); Health (clinic, hospital, home for the elderly); Sports (sports fields, swimming pool); Community (square with shops, bars, PT, clinic, etc.); Meetings and Events, Family Recreation. The total area of ​​greenery and accessible to the public extends over about 30 ha.

The plan was presented in compliance with the indications of the PRG

> Location

   Sesto S. Giovanni, Italy

> Client

Acciaierie e Ferriere Lombarde Falck

      

> Period 

   1995 - 1997

> Architectural design

   Kenzo Tange Associates

Project Summary

Surfaces

1.300.000 sqm

Value of works

Confidential

Services

- Infrastructure concept phase,

- Development area study hypothesis

bottom of page