| Location | Conselice (RA) |
| Period | 2000/2001 |
| Costs | € 2.580.000 |
| Tekne Services | Preliminary and Detailed design, Construction documents of components. |
The project of the office building is due to the need of re-organize all the technical and administrative functions (purposes) connected to the factory.
Tha overall surface of the building is about 2.500 sq.m. distributed in 4 floors above ground
The main features of the building are:
A new entry to the factory with a new lodge is also foreseen to be located between the factory and the new parking (trucks and cars) to be realized. out side the building.
A small parking will be located in the back of the building.