| Location | Fontaneto d’Agogna (Novara) |
| Period | 2003/2004 |
| Costs | € 1.350.000 |
| Tekne Services | Design, safety coordination and Construction Supervision. |
Realisation of a new building, two storeys above ground, for taking over the Technical Office of the factory in Fontaneto d’Agogna. The building, on a surface of 900 m2, will have steel structure, HVAC system and façades with insulated panels in corrugated sheet-iron.
It has also been developed and realized the restyling of the entrance hall and adjacent areas (400 m2) of the offices complex.