| Location | Varese |
| In collaboration with | Ishimoto Architectural & Engineering Firm Inc. and Prof. Giorgio Corbellini |
| Period | 2002/2003 |
| Costs | € 111.038.000 |
| Tekne Services | Preparation of the pre-tender stage design of the civil works and preliminary design of the electromechanical services; detailed design of civil works. |
The works include the construction of a large treatment and services area on three levels and two wings for medical and surgical wards (total surface 81.000 m2 - about 735 beds).
Very important is the dimension of the operating department, with 20 operating rooms and the imaging department.
Other departments are: